Project:
Project Contractor:
Polyurea Applicator:
System Applied:
Substrate / Area:
Date Completed:
KEYS Energy Services
Sunrise Systems of Brevard, Inc.
F.S.I., Inc. of Fort Myers
Polyurea
10,800 sq. ft.
August 2003
Key Utilities was experiencing leaks through pre stressed concrete roof. Water was leaking in various rooms below.
Polyurea was chosen because of its proven history. Another factor was the UV stability. Fast set & cure time was of the essence as we were in the middle of rainy season.
The concrete roof was water blasted to remove the existing paint. Cracks were repaired and a solvent free primer was applied. 80 mils of polyurea were applied with a slip resistant texture. The roof made it through four hurricanes without a leaking drop.
FSI Coatings, Inc 11000 Metro Parkway, Suite 20
Fort Myers, FL. 33912
FL. Cert. #CPC044101